Your Exclusive Source for
Custom and Ready-to-Ship
Solutions to Optimize the Capabilities and
Performance of Your Rotationally Molded
Polyethylene Tank
This ladder is also commonly used for accessing the top manway, electronics, and the dome of the tank. The boarding rails serve as an “assist” for ladder step-off and step-on, and the safety cage is an OSHA requirement when the top rung height exceeds 20 feet (although many companies require cages for all ladders regardless of height). Generally speaking, the top rung height is the height of the flat on which the tank manway is located. Or, if the ladder is located somewhere other than the manway location, then the top rung is the same height as the top knuckle (top of straight side). Safety gates are available as an option in stainless steel, galvanized steel, and powder coated (yellow) steel for increased operator safety. Because intermediate brackets are not used on PE tanks, we provide “stiffeners” for our ladders when the length exceeds 72"
NOTE: Prior to fabrication of your ladder, we will need a drawing of the tank or the size and manufacturer - we will then submit a drawing for your approval.
NOTE: Prior to fabrication of your ladder, we will need a drawing of the tank or the size and manufacturer - we will then submit a drawing for your approval.
Unit of Measure
Specifications
Tank Height |
N/A 10 to 12 ft |
Ladder Brackets |
N/A CLB - 304SS Compensating Ladder Bracket Ass. (Sidewall Mount for all PE Tanks) (QUOTE)MIL-PP - 304SS Molded-In Lug Ladder Bracket Ass. (for Poly Processing Tanks) (QUOTE)MIL-SI - 304SS Molded-In Lug Ladder Bracket Ass. (for Snyder Industries Tanks) (QUOTE) |
Notes |
N/A Prior to fabrication of your ladder, we will need a drawing of the tank or the size and manufacturer - we will then submit a drawing for your approval. |